PROJECT OVERVIEW:

  • Supply and installation of precast concrete noise walls and retaining walls of total approx. 55,930.8 sq ft along the new M5 motorway.
  • Precast panels consist of plain grey finish with a squiggle pattern moulded into one side.
  • Total of 521 panels casted in a two and a half month period.
  • There were approx. 250 piles constructed, varying in depth and pile diameter based on the design and existing ground conditions.
  • The wall provides both a prominent, consistent look whilst travelling along the new M5 motorway and also a reduction in noise generation.

YEAR:

2018-2019

LOCATION:

New South Wales