PROJECT OVERVIEW:
- Supply and installation of precast concrete noise walls and retaining walls of total approx. 55,930.8 sq ft along the new M5 motorway.
- Precast panels consist of plain grey finish with a squiggle pattern moulded into one side.
- Total of 521 panels casted in a two and a half month period.
- There were approx. 250 piles constructed, varying in depth and pile diameter based on the design and existing ground conditions.
- The wall provides both a prominent, consistent look whilst travelling along the new M5 motorway and also a reduction in noise generation.
YEAR:
2018-2019
LOCATION:
New South Wales