PROJECT OVERVIEW:

  • 9.8 ft high RMP panels were used in construction, with each panel displaying a custom design leaf pattern moulded into the panel, to satisfy stringent architectural requirements and to blend in with its surrounding forestry.
  • AUS Group’s scope included preliminary works involving preparation of design drawings, sample products and production of panel moulds, along with the supply of all RMP panels.

YEAR:

2016-17

LOCATION:

Groningen, Netherlands