PROJECT OVERVIEW:
- Supply and Installation of Permanent Precast Noise Walls – The permanent works consisted of post installation and precast installation on 15 different noise walls throughout the project. With over 1800 precast panels supplied to the project from 3 different precast suppliers.
- Design, supply and Installation of Temporary Noise Walls – The temporary noise wall included an innovative design of a steel noise all on top of precast barriers, which allowed for no permanent structures or damage to the existing road while construction was carried out.
- Anti-carbonation Coating of Concrete Structures – Over 40 different concrete structures including Bridges, Retaining Wall, Noise Walls and Barriers were painted for the project totaling to over 150,694 sq ft of surfaces coated.
YEAR:
2016 – 2017